Arched hangar or Arched hangar 24 × 15 m?
Both examples are generated with the same parameters; only the covering differs. Quantities include waste, no prices – the generator shows the price from the catalogue. A preliminary result, not a design.
Key facts
| Covered | Frame only | Difference | |
|---|---|---|---|
| Footprint | 24 × 15 m | 24 × 15 m | |
| Built-up area | 360 m² | 360 m² | = |
| Wall height | 0.1 m | 0.1 m | = |
| Ridge height | 0.62 m | 0.62 m | = |
| Labour hours | 259 h | 156 h | −103 h (-40 %) |
| Material lines | 14 | 12 | −2 |
| Materials (incl. waste, incl. VAT) | €17,369.78 | €12,222.50 | −€5,147.28 (-30 %) |
Preliminary prices from catalogue lt-2026-10 (2026-10-25). This is an example, not an offer: supplier prices vary and labour depends on your rate – you enter it and your own materials in the generator. Catalogue prices are still being verified.
Material quantities
Lines that differ come first; “—” means the material is not used in that variant.
| Material | Unit | Covered | Frame only | Difference |
|---|---|---|---|---|
| PVC tent fabric (~650 g/m²)Roof | m² | 726.67 | — | −726.67 |
| Tent tension straps and fixings (per arch)Roof | set | 13 | — | −13 |
| Concrete C20/25Foundation | m³ | 7.56 | 7.56 | = |
| Formwork (boards / panels, rental)Foundation | m² | 31.68 | 31.68 | = |
| Lightweight block 500x250x200Walls | pcs | 485 | 485 | = |
| Masonry mortar M5Walls | m³ | 0.75 | 0.75 | = |
| Steel tube 100x100x3Walls | m | 97.51 | 97.51 | = |
| Bent steel arch (tube Ø76×3.2)Roof | m | 300.56 | 300.56 | = |
| Post base plateRoof | pcs | 26 | 26 | = |
| Wind bracing rod Ø16 with turnbucklesRoof | m | 94 | 94 | = |
| Floor batten 45x95 C24Roof | m | 528 | 528 | = |
| Hangar gate (frame with infill)Openings | m² | 23.63 | 23.63 | = |
| Steel tube 100x100x3Openings | m | 14.84 | 14.84 | = |
| Anchor bolt M12Fasteners | pcs | 107 | 107 | = |
Start with “Covered”Start with “Frame only”
All comparisons · Find a specialist to prepare or check the design
Rule set lt-v1, catalogue lt-2026-10.